Posted By
Posted in
Banking & Finance
Job Code
542717
- Developing the Periodic Project cost reports of high accuracy, create cash flows analyzing the commitment /spent and forecasts of the project and create the cost narratives for chemical plants, petro chemicals, refineries etc., of small, medium or large projects.
- Lead the cost changes or deviations. Alert on thresholds and enhance controls. Integrate with various functional disciplines as a team player ensuring the right inputs for the accurate forecasting.
- A self-starter and should analyze the contingency forecast and the drawdowns and cost accruals periodically to enhance smooth execution of the project.
Didn’t find the job appropriate? Report this Job
Posted By
Posted in
Banking & Finance
Job Code
542717