Posted By

Smita Saxena

Sr Manager HR at EPack Polymers

Last Login: 15 February 2024

Job Views:  
573
Applications:  20
Recruiter’s Activity:  6

Job Code

1358696

EPACK Prefab - Plant Head - Pre Engineering Building

15 - 20 Years.Greater Noida
Posted 4 months ago
Posted 4 months ago

- Plant handling Manufacturing exp. of Pre-engineered Buildings is Must.


- Responsible for total Production, Quality, Maintenance and dispatches.

- Responsible for Daily, weekly and monthly production planning and man power planning.

- Coordinating with client for quality related issues.

- Verifying the daily production and inspection reports.

- Preparing consumables cost per ton theoretical and actual calculation.

- Optimization of material & man power.

- Preparing monthly fabrication and painting cost per ton.

- Daily monitoring material status, production, painting, dispatch and quality process.

- Cost controlling like welding consumable, gases, drill bits, paints and job work contractors etc.

- Closing the job as per Phase wise.

- Manage the QA & QC Department.

- Coordinating with other department for smooth functioning of system.

- Organize In-House Destructive and Non-Destructive testing.

- Looking after all the Departments of plant - Puff panels, Cold form and Fabrications.

Didn’t find the job appropriate? Report this Job

Posted By

Smita Saxena

Sr Manager HR at EPack Polymers

Last Login: 15 February 2024

Job Views:  
573
Applications:  20
Recruiter’s Activity:  6

Job Code

1358696

UPSKILL YOURSELF

My Learning Centre

Explore CoursesArrow